Get in touch:  GANG@CZ-SHREE.COM  7 Days a week from 9.00am to 21.00pm

MANUFACTURING AND QUALITY CONTROL BLOG

In the garment industry, whether you are a manufacturer, importer, or brand, you must understand the importance of quality control in this business. This industry shifts swiftly, and any time lost in shipment or defect fixings can lead to unimaginable losses. Moreover, quality issues can quickly disseminate in the digital age, giving competitors an advantage. Therefore, quality control is essential, and quality inspection is the most commonly used method. In this post, we will guide you through the steps of a garment quality inspection, the key checkpoints to focus on, and how can C&Z expertise support your garment quality control.

C&Z Quality Assurance: 2025 Ultimate Guide for Studded Round Neck Pullover Inspection

As an ISO 17025 accredited third-party testing lab, C&Z provides 23 critical inspection services for studded knitwear, including embellishment durability, chemical compliance, and smart textile verification, ensuring global market access.

I. 2025 Inspection Protocol Updates

Aligned with latest standards:

Embellishment Security

Rhinestone adhesion test: 50N tension with 200-cycle abrasion (ASTM D5171-22)

Sharp edge inspection: Compliance with CPSIA section 101(b)

Chemical Compliance

Heavy metal migration (Pb, Cd, Ni per EU REACH Annex XVII)

Phthalates screening (SCCP updated 2025 limits)

Functional Verification

Fragrance release material cytotoxicity (ISO 10993-5)

Phase-change fiber thermal regulation validation (-4°F to 140°F)

II. 6-Dimensional Testing Matrix

Dimension Equipment Standards

Embellishment Durability Instron 5967 Universal Tester ASTM D517

1-22 Fiber Composition PerkinElmer Spectrum Two FTIR ISO 1833-2025 Colorfastness Xenotest Alpha LM+ AATCC 16.3-2025

Chemical Residues Agilent 8890 GC-MS CPSC-CH-C1001-09.3

Microstructure Hitachi SU5000 SEM JIS L 1089-2025

Wear Simulation SDL Atlas Martindale Tester ISO 12947-4:2025

III. Streamlined Inspection Workflow

Pre-Testing Consultation (1-3 Days)

Receive Design Risk Assessment Report (28 potential defect alerts)

Lab Testing Phase (5-7 Days)

Accelerated "3+5" mode: 3-day basic tests + 5-day advanced analysis

Certification Service (48hr Expedited Available)

One-stop certification for CE, CPSIA, and AS/NZS 1249

Post By :sbree C&Z